Ellenbrook Primary School, Worsley, Manchester
Main Contractor: MCAVOY GROUP
M&E Consultant: PATRICK MCCAULÂ ENVIRONMENTAL CONSULTING ENGINEERS
About The Project
The New School Building comprised of Classrooms, Toilet facilities, stores, circulation areas, and an extensive plant room.
The building was constructed to a very high standard and having used BIM to manage the design process. This minimised clashes among the various design principles (mechanical, electrical, structural, and architectural). The designer created 3D models of the building and rooms in order that the school could have a better understanding of the layout and better plan the placement of furniture and equipment.
The Mechanical Services provided include for the following:
- LPHW Heating installation
- Water Services Installation
- Above ground Soils & Wastes
- BMS and Controls System Installation
- Sanitary ware Installation
- Extract Ventilation
- Plant Room
- Natural Gas installation